Spain’s S-80 submarine program designed subs that were 70 tons too heavy and likely to sink when submerged. The cost to fix it is expected to be ~$9 billion. The problem was traced back to an engineer misplacing a decimal point. – WTF Fun Facts
Source: https://o.canada.com/news/spain-builds-submarine-70-tons-too-heavy